New Electricity Connection Application Guide 2026

Step-by-step procedure for applying for a new domestic or commercial electricity meter online in Pakistan via enc.com.pk for LESCO, IESCO, FESCO, MEPCO, PESCO, GEPCO, HESCO, QESCO, SEPCO, and K-Electric.

In Short
Verified Summary
Audio Guide:

How to Check or Verify: New Electricity Connection Process 2026

To get a new electricity connection in Pakistan, apply online at enc.com.pk (or ke.com.pk for Karachi). Upload CNIC, property ownership proof, wiring test certificate, and a neighbor’s bill. After a site survey, pay the Demand Notice at a bank. Meters are typically installed within 15–30 days.

Central Portal: PITC & NEPRA Standardized

Electricity New Connection (ENC) Online Portal

All government distribution companies (DISCOs) use the central enc.com.pk system. Applicants no longer need to pay illegal middlemen. The online application is completely free; fees are paid strictly via bank-issued Demand Notices.

Mandatory Document Checklist for New Connection

Prepare clear scanned copies before starting your ENC portal application.

1. Applicant CNIC CopyAttested front and back scanned copy of the applicant's valid Computerized National Identity Card.
2. Proof of Property OwnershipRegistered Title Deed (Registry), Fard-e-Malkiat from PLRA, or Housing Society Allotment Letter in applicant's name.
3. Neighbor's Paid Electricity BillCopy of a recent paid bill from an immediate neighbor to establish exact feeder/sub-division location.
4. Wiring Test CertificateCertificate issued by a licensed electrical wiring contractor confirming internal premises wiring safety.
5. Owner NOC (For Tenants)If renting, a signed No Objection Certificate (NOC) on Rs. 100 stamp paper from the property owner.
6. Undertaking AffidavitAffidavit on stamp paper affirming that no previous unpaid electricity arrears exist on the property.

Load Categories & Installation Timelines

Sanctioned load determines your connection class and Demand Notice cost.

Category 1

Up to 15 kW (Domestic/Commercial)

Single-phase and three-phase meters for residential homes and small shops. Timeline: 15–30 Days post Demand Notice payment.

Category 2

16 kW to 70 kW (Commercial/Industrial)

Medium-scale commercial buildings, plaza floors, and small industrial units. Timeline: 30–45 Days.

Category 3

71 kW to 500 kW (Heavy Industrial)

Requires dedicated transformer installation and grid station clearance. Timeline: 45–60 Days.

Step-by-Step Application Procedure (enc.com.pk)

1

Access the Official ENC Portal

Visit enc.com.pk (or ke.com.pk for K-Electric) and select "Apply New Connection" from the main menu.

2

Select DISCO & Connection Category

Choose your local distribution company (e.g., LESCO, IESCO, FESCO) and select Category 1 (up to 15 kW for standard domestic/commercial connections).

3

Fill Personal & Property Details

Provide applicant CNIC, property address, nearest neighbor’s bill reference number, and sanctioned load requirement.

4

Upload Scanned Documents

Upload clear scans of CNIC, property ownership document (Registry/Fard), wiring test report, and neighbor’s bill.

5

Site Survey & Demand Notice Generation

A local Sub-Divisional Officer (SDO) conducts a site survey. Once approved, download your Demand Notice from enc.com.pk using your Tracking ID.

6

Pay Demand Notice & Meter Installation

Pay the Demand Notice at designated bank branches. Submit paid receipt copy to SDO office; meter installation completes within 15–30 days.

Frequently Asked Questions (FAQ)

How do I apply for a new electricity connection online in Pakistan?

You can apply online through the official Electricity New Connection (ENC) portal at enc.com.pk for all government DISCOs (LESCO, IESCO, FESCO, MEPCO, PESCO, GEPCO, HESCO, QESCO, SEPCO). Select your DISCO, fill out the form, receive a Tracking ID, and upload required documents.

What documents are required for a new domestic electricity connection?

Required documents include an attested copy of applicant CNIC, proof of property ownership (Registry, Fard-e-Malkiat, or Allotment Letter), a copy of a neighbor’s paid electricity bill (for reference location), a Wiring Test Certificate from a licensed electrical contractor, and an affidavit on Rs. 100 stamp paper stating no prior dues exist.

What is a Demand Notice (DN) and how is it paid?

A Demand Notice is the official fee voucher issued by your DISCO after verifying your site and load requirements. It includes meter security deposits and line extension charges. Once generated, you can download it from enc.com.pk and pay at designated commercial bank branches.

How long does it take to get a new electricity meter installed?

For Category 1 connections (up to 15 kW domestic/commercial single-phase or three-phase), meters are typically installed within 15 to 30 days after paying the Demand Notice. High-load Category 2 and 3 connections may take 45 to 60 days.

How do Karachi residents apply for a K-Electric connection?

K-Electric operates its own separate portal at ke.com.pk or through KE Customer Care Centers. Karachi residents register online, schedule a site survey, pay the Demand Notice, and get energized directly through K-Electric.